// Stead Global · Project Intelligence · Active

Stead Global

Services

Trained people. One methodology.

When a turnaround slides or a capital program loses visibility, the gap is almost always in project controls. We fix it with trained people who arrive ready to run.

ENG.A: Staffing + Methodology

Disciplines we deploy.

SVC.01

Safety Coordination

Safety that integrates instead of polices. Our coordinators understand the work well enough to protect it, speaking fluently to both the crew on the ground and the leadership making decisions above it.

SVC.02

Scheduling

A schedule is only as good as the commitments behind it. Our schedulers build from the field up: real conversations, real constraints, real commitments, so the plan holds when it meets reality.

SVC.03

Cost Analysis

By the time most cost reports hit a desk, the damage is done. Our cost professionals track what's happening in the field, catch the bleed early, and put numbers in context before they become a problem.

SVC.04

Materials Management

The wrong material in the wrong place at the wrong time stops everything. Our materials specialists track how supply chain decisions flow through schedule and cost, staying ahead of the consequences before they hit the critical path.

SVC.05

Document Control

A document control system that nobody uses is just organized chaos. Ours get used, because they're built around how the project actually works, not how it was supposed to work on paper.

SVC.06

Project Controls

Every discipline runs its own race. Project controls is what keeps them running the same one. Our teams sit at the intersection of field execution and project leadership, translating, connecting, and keeping the whole system honest.

ENG.B: Diagnostic Assessment

Intelligence Quotient.

01

The Problem

Your project has the data. The problem is it's not talking to itself. Schedules that don't reflect cost, cost that doesn't reflect the field.

02

The Method

IQ

Scored · Prioritized

03

Focus Area

Turnaround IQ: built for STOs and shutdowns, where time compression amplifies every communication gap.

04

Delivered

Full system audit
Scored gap analysis
Prioritized roadmap
10-day delivery

Ready to Staff

Get the right people on your project.

Request Briefing